We got the opportunity to quote this job because we was recommended by a previous customer we arrange a time to visit the job and spoke to the customer to see what was involved we sent over a quote which the customer accepted so we just agreed a start date.
We turn up on time as agreed we was able to carry out this job efficiently
Using our own excavator and trailer to carry out the work smoothly and tidy by not having loss material tipper on the driveway so we didn’t cause no inconvenience to the client by taking up room on the driveway
The shed base was at the bottom of the garden we use board to track the excavator to the bottom of the garden so we didn’t damage the lawn
Mark out the shed base and excavated the soil which we reuse to level up some low area two jobs at the cost of one
We pick up the mot type1 on are trailer keeping mess to a minimum which we wheelbarrow down to the bottom of the garden we also install Geotextile membrane then we laid 100mm type 1 and compact it with a whacker plate
To ensure this solid sub base
Install the timber shuttering and poured the concrete with reinforced mesh to stop it cracking finish the job on time and as agreed to the quote leaving no mess or damage to the lawn The client was happy 😃